Not only during a factory acceptance by a customer, but with every system produced by Hitzinger both components and the whole system the functions are put through their paces.
This saves valuable time when putting the system into operation at the customer. In our very well equipped test department all necessary test as heat run, efficiency, soind, vibration, emission and all test for parallel operation of system can be passed through.